Ir arriba

Optimal black-start sequence of distributed generation

After a major blackout, the system undergoes a black start where some so-called black-start generators connected to the transmission system are started up first, and then demand blocks and further generators are iteratively re-connected. Currently, black start follows a top-down approach, but distributed generation within the distribution systems can also support this process, leading to a complementary bottom-up approach. This project aims at determining the optimal black-start sequence of distributed generation within an islanded part of a distribution system.

Alumnos

Alejandro Lacave Díez

Ofertado en

  • Máster en Ingeniería Industrial (electrónico) - (MII-N)
  • Máster en Ingeniería Industrial (electrotécnico) - (MII-E)
  • Máster en Ingeniería Industrial (emprendimiento) - (MII-P)
  • Máster en Ingeniería Industrial (mecánico) - (MII-M)
  • Grado en Ingeniería en Tecnologías Industriales (electricidad) - (GITI-E)
  • Grado en Ingeniería en Tecnologías Industriales (electrónica) - (GITI-N)
  • Grado en Ingeniería en Tecnologías Industriales (mecánica) - (GITI-M)
  • Grado en Ingeniería en Tecnologías Industriales (organización) - (GITI-O)