Broadband PLC over Low Voltage grid pilot roll-out results assessment and full roll-out

The scope of this project is to perform the analysis of current Iberdrola’s BPL over LV grid roll-out, to assess the performance of current technology, and project those results to forecast and anticipate results in a prospective future full roll-out. •The project will involve a first phase of analysis real-time results of some hundreds of secondary substations already rolled-out with a market BPL technology, reaching smart meters’ building concentrations. •The project will continue with the analysis of the BPL in LV related aspects of the total footprint of Iberdrola’s Secondary Substations (SSs). This will provide a categorization of SSs that will lead to forecast their suitability for the roll-out. •The final deliverable will include a report with the range of SSs and their expected performance when working with current BPL over LV technology.

Alumno

Minerva Carballo Palacio

Ofertado en

  • Máster en Ingeniería Industrial (electrotécnico) - (MII-E)