Ir arriba
Información del artículo en conferencia

Hydro-scheduling experiences in Iberdrola

A. Perea, R. Bellido, P. Sanz-Ruiz, E. López Rodríguez, J.M. Latorre, A. Ramos, S. Cerisola

4th IEEE and Cigré International Workshop Hydro Scheduling in Competitive Markets Bergen, Bergen (Noruega). 14-15 junio 2012


Resumen:
Planning output production of hydropower plants is one of the key issues for a utility company. Iberdrola owns and operates the largest hydropower installed capacity in MIBEL (Spain and Portugal) and has accumulated a huge amount of experience in this field. Optimization and Simulation are the chosen tools of Iberdrola to deal with hydro-scheduling in market conditions. These models are also useful for planning maintenance and designing or upgrading hydropower plants. This paper shows several examples of these cases


Palabras clave: Hydroelectric power generation, optimal scheduling, power system simulation, energy management


Fecha de publicación: junio 2012.



Cita:
Perea, A., Bellido, R., Sanz-Ruiz, P., López Rodríguez, E., Latorre, J.M., Ramos, A., Cerisola, S., Hydro-scheduling experiences in Iberdrola, 4th IEEE and Cigré International Workshop Hydro Scheduling in Competitive Markets Bergen, Bergen (Noruega). 14-15 junio 2012.


    Líneas de investigación:
  • *Planificación Táctica a Medio Plazo

IIT-12-083A

pdf Solicitar el artículo completo a los autores