Elaboration of the S2F Pilot project proposal

T. Gómez J.P. Chaves M. Troncia M.A. Ruiz

April 2024 - May 2024

Funding entity I-DE Redes Eléctricas Inteligentes, S.A., ANELL, GASELEC, ENERCOOP, CONILENSE, CUERVA, E-REDES, E-DISTRIBUCIÓN REDES DIGITALES, VIESGO, UFD


The objective of the collaboration is to prepare the three reports required by the CNMC Circular 8/2021 for the presentation of a pilot project for 10 electricity distributors in Spain. The pilot project deals with implementing flexibility solutions in distribution networks, with two use cases: local flexibility markets and flexible connections.


Layman's summary: Drafting of the proposal to implement a pilot project on flexibility solutions in electricity distribution networks in Spain.