Funding entity ATISAE
Participated by THYSSENKRUPP ELEVADORES
This project studies standard times for different elevator assembly operations at buildings under construction. These assembly activities are divided into mechanic and electric assembly phases. These activities initiate at materials reception and finish at elevator’s commissioning. Mechanic phase requires timing two operators and electric phase requires timing only one operator. To evaluate task efficiency the most critical operations are evaluated timing different operators.