This work is aimed at ellaborating a report that will show the technical and economical adavantages of a ultra-fast start-up system of gas turbines. In addition, it will address how to fit this novel system within the regulatory framework of the Spanish island systems.
Research topics:
- Automatic generation control: Design and tuning of AGC regulators, identification of power plant models, primary and secondary regulation ancilliary services
- Stability: Large disturbance stability, tuning of frequency loadshedding schemes, excitation control, small disturbance stability, tuning of power system stabilizers, identification of AVR and governor models