Project information

ANDASOL III Incidents Assessment

L. Mochón F. Nieto

December 2013 - January 2014

Funding entity Marquesado Solar


1. Possible relationship between the two claims (gearBox and blades of the low pressure turbine).
2. Others incidents (broken pipes, etc.) have also affected the availability of the plant. Their contribution to the loss of profit should be quantified.
3. Mean time to repair each type of damage including the time to manufacture a set of blades.
4. In the period from July 19, 2012 to January 25, 2013, many actions has been taken over the Gear Box to keep the plant working. Some of these actions should be considered part of the repair and should be covered.